Basketball Hoops Home | View Cart View Cart | Installation | FAQ | About Us | Contact Us

Home: First Team PowerHouse Series Assembly Instructions

 

First Team Sport Series Assembly Instructions

 

Bill of Materials
A (1) Vertical Post J (4) ½" Hex Nut
B (1) Extension Arm K (2) 3/8" Flatwasher
C (2) Backboard Brace L (2) 3/8" Lockwasher
D (1) Clamp Bar M (2) 3/8" Hex Nut
E (1) 4" Post Cap N (2) 5/16" x 1" Machine Screw
F (2) 4" U-Bolt O (2) 5/16" Flatwasher
G (1) 2" U-Bolt P (2) 5/16" Lockwasher
H (1) Backboard Frame Support Q (2) 5/16" Hex Nut
I (4) ½" Lockwasher  

NOTE: Immediately unpack all components and cross check against bill of materials. Report any shortages to First Team customer service at 1-888-884-6677.

1. Locate and dig a 12" minimum diameter x 36" deep hole.

2. Fill hole with wet premixed concrete, insert vertical pole leaving 108" above desired playing surface. Vibrate to settle concrete. Place 4" square post cap on top of pole.

3. Make sure post is straight and plumb. Brace while drying if necessary. Allow 24 hours minimum drying time before continuing assembly.

4. Using 4"x ½" U-Bolts, lockwashers and nuts attach the extension arm to the vertical pole either at the desired rim height or at ground level.

5. Loosely attach backboard braces to extension arm using 2"x 3/8" U-Bolt, clampbar, flatwashers, lockwashers and nuts.

6. Remove and discard the shipping block (plastic piece) located at the backboard joint. Bolt on backboard frame support to the center four holes located at the top of your backboard using the 5/16" hardware provided with the backboard.

7. Attach desired backboard and rim placing bolts through rim, backboard and extension arm. Tighten with rim level to backboard and arm. Packaged in with your backboard are two black rubber gaskets. Be sure to place one rubber gasket between the face of the backboard and the rim and the other between the extension arm and the backside of the backboard. Trim gaskets if necessary.

8. Attach backboard braces to side holes in backboard frame using 5/16" hardware provided. Bend braces to fit as necessary.

9. Tighten all bolts.

10. If you attached extension arm at ground level, slide entire assembly to desired rim height and tighten U-Bolts making sure entire project is level and square. When sliding assembly, be careful not to scratch the paint on the vertical pole.

Tip: If you are setting the unit at 10 feet, the bottom of the extension arm will be bolted approximately 95 ½" up the vertical post.

 

Shipping Information | Policies | Associated Sites | Site Map

© 2013 Atlanta Hoops, Inc. All rights reserved.

TOll FREE: 404-378-8775

Basketball Equipment | Basketball Hoops | portable basketball goals | Cheap Basketball Goals | Portable Basketball Hoops | Basketball installation | Basketball Goals | Outdoor Basketball Goals | Adjustable Basketball Goals | Kids Basketball Goals | Exercise Equipment